Key Requirements and Conditions
Temporary Home Occupancy Permits are subject to strict criteria, including:
You must hold a valid building approval for a permanent Class 1a dwelling on the subject site.
Permits are typically issued for up to 12 months, with a possible extension (generally up to a maximum of 18 months) where genuine construction progress is demonstrated.
Temporary occupation must include:
- Safe and reliable water supply
- Toilet and bathing facilities
- Approved wastewater and waste disposal
- Basic cooking, sleeping, and hygiene facilities
Temporary living arrangements must meet minimum public health standards. A hose, extension lead, or makeshift arrangements are not sufficient.
Temporary structures must:
- Be appropriately setback from boundaries;
- Be located and screened to minimise visual and amenity impacts; and
- Not adversely affect neighbouring properties.
Only the property owner and immediate family may reside on site.
Temporary occupancy cannot be used for rental purposes or multiple households.
Typical conditions require:
- Ongoing and demonstrable progress toward completion of the permanent dwelling;
- Cessation of temporary occupancy by a fixed date; and
- Removal of residential fittings so the structure reverts to non-habitable use once the dwelling is completed.
Temporary Home Occupancy is a privilege, not a right. Failure to comply with conditions may result in cancellation of the permit and enforcement action.